(Difference between revisions)
Revision as of 08:56, 11 August 2006 Peter (Talk | contribs) (→'''Entering and importing weather and crop data.''') ← Previous diff |
Revision as of 08:58, 11 August 2006 Peter (Talk | contribs) Next diff → |
||
Line 1: | Line 1: | ||
- | <blockquote> | ||
<blockquote> | <blockquote> | ||
='''Entering and importing weather and crop data.'''= | ='''Entering and importing weather and crop data.'''= | ||
Line 27: | Line 26: | ||
- | + | </blockquote> | |
----------- | ----------- |
Revision as of 08:58, 11 August 2006
Entering and importing weather and crop data.
After a network has been created, crop data can be entered by hand. In principle this is possible for grid-based networks and station networks alike. However as grid-based networks do not coincide with a ground network, it will usually not make sense to enter data manually.
Entering weather data manually
As the FAO water balance model is usually run with a 10-day (dekadal) time step, this example will show how to enter dekadal data.
Activate the Database - Manage Weather Data - Dekad function.